TAFE NSW NEWCASTLE

Undertake the modifications and new works to remove the concrete roof and  replace with structural steel/metal roofing including new drainage at TAFE  NSW Newcastle

The external wall are required to be temporarily propped during the removal of existing concrete roof until the new structural steel is installed. Protection of the existing equipment was required during this project.

Client
Tafe NSW

Cost
$500k

Project Type
Education/Remediation

Architect
GHD

Project Size
90m2

ABORIGINAL HOUSING OFFICE

The project involves the construction of 3 dwellings for the Aboriginal Housing Office.

Each dwelling consisted of 2 bedrooms, living room, dining, garage and privately fenced yards.

All 3 dwellings and the full stormwater system were constructed over 120 screw piers due to poor ground conditions.

The project was delivered 4 weeks ahead of the original PC Date and within the client budget.

Client
Land & Housing Corporation

Cost
$1.2 million

Project Type
Residential

Architect
DTA Architects

Project Size
1050m2

ST GEORGE COMMUNITY HOUSING

The recently completed St George Community Housing, a 41-apartment multi-residential development in Fairfield, which provides affordable housing through subsidized rent for people whom are employed and earning moderate incomes. 

This five storey complex features 3 studio apartments, 14 one bedroom apartments and 24 two bedroom apartments with 19 car spaces on the ground floor and services and solar panels on the roof.

Client
St George Housing

Cost
$11.0m

Project Type
Multi-Residential

Architect
DKO Architects

Project Size
Approx 1500m2